Previous
Next
Share
Free Delivery in India | Lowest Global Shipping Charges
24/7 Customer Support
24/7 Customer Support

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

24/7 Customer Support
Save up to 28% with GST Input

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

Lowest Price Challenge
# Lowest Price Challenge

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Lowest Price Challenge
100% Original Products

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase

Parker UCC Flowline Series Industrial Flow Meter Brass Body 2L/min to 20L/min FM26222122

Category Flow Meter Brand Parker UCC Condition New

Specifications

Country of Origin United Kingdom
Brand Parker UCC
Body Material Brass
Model FM26222122
Series Flowline
Maximum Operating Temperature 90°C
Minimum Flow Rate 2L/min
Maximum Flow Rate 20L/min
Wetted Materials Brass

Key Features

  • Constructed with a durable brass body for industrial reliability.
  • Operates reliably up to a maximum temperature of 90°C.
  • Utilizes a differential pressure piston mechanism ensuring ±5% full scale accuracy.
  • Suitable for oil and water calibration with magnetic coupling for precise readings.
  • Rated for pressure operation up to 350 bar, compatible with various installations.
  • Features a graduated flow scale on the outer viewing sleeve for direct reading.
  • Designed for industrial, HVAC, water treatment, and automation systems applications.
  • Precision repeatability of ±1% full scale enhances monitoring and control.

Product Description

The Parker UCC FM26222122 Flowline Series Flow Meter is an industrial-grade device designed to accurately measure fluid flow rates from 2 liters per minute up to 20 liters per minute. Featuring a robust brass body, this flow meter is engineered for durability and longevity in demanding environments. It supports operation at temperatures up to 90°C, making it suitable for a wide variety of industrial applications including HVAC systems, water treatment plants, manufacturing processes, and automation controls.

The device employs a differential pressure technique utilizing a piston that responds to flow changes by moving against a calibrated spring, guaranteeing precise and repeatable measurements with an accuracy of ±5% full scale and repeatability within ±1% full scale. The piston’s movement is magnetically coupled to an indicator ring visible on the outer viewing sleeve, allowing for easy and direct flow readings without complex instrumentation.

Capable of withstanding pressures up to 350 bar, the flow meter is calibrated for both oil and water mediums and demonstrates relative insensitivity to viscosity changes, enhancing its versatility across fluids. Installation flexibility is provided as the meter can be mounted on any plane without loss of accuracy or performance.

Constructed with a durable brass body ensuring industrial reliability. Designed for fluid flow measurement ranging from 2L/min to 20L/min. Accuracy of ±5% full scale and repeatability of ±1% full scale. Works at maximum operating temperatures up to 90°C.

Pressure rating supports up to 350 bar for high-pressure applications. Direct reading through a graduated outer flow scale and magnetically coupled indicator ring. Calibrated for both oil and water, maintaining performance despite viscosity variations.

Suitable for applications in industrial processes, automation, water treatment, and HVAC.

This flow meter is part of the Parker UCC Flowline series, renowned for precision, durability, and adaptability. Its industrial-grade construction and reliable performance make it an optimal choice for measuring fluid flow in high-demand commercial and industrial settings. Explore more Flow Meters and industrial measuring equipment at EnvMart to meet your process control requirements.

Parker UCC Flowline Series Industrial Flow Meter Brass Body 2L/min to 20L/min FM26222122
Looking to purchase in bulk?
  • Purchase item in bulk quantity
  • Get best price for your business

Comments (0)

No customer reviews for the moment.

Frequently Asked Questions

The flow meter measures fluid flow rates from 2 liters per minute to 20 liters per minute.

It operates reliably at a maximum temperature of 90°C.

This flow meter has an accuracy of ±5% full scale and a precision repeatability of ±1% full scale.

The flow meter features a brass body and wetted materials are also brass, ensuring durability in industrial applications.

It is rated for pressure operation up to 350 bar, making it suitable for high-pressure applications.

Yes, it is calibrated for both oil and water, maintaining performance despite variations in viscosity.

The flow meter features a graduated flow scale on the outer viewing sleeve, allowing for easy and direct reading.

It can be mounted on any plane without loss of accuracy or performance, providing installation flexibility.

It is designed for use in industrial processes, HVAC systems, water treatment, and automation controls.

It utilizes a differential pressure piston mechanism that ensures precise and repeatable measurements.

The country of origin for this flow meter is the United Kingdom.

This model is part of the Parker UCC Flowline series, known for its precision and adaptability.

Related Products

Recently Viewed Products

$1,171.53
$1,136.38 Save 3%
Tax included
Quantity
Delivery Time Delivered within 0-3 days
  • Global Payments 140+ CountriesGlobal Payments 140+ Countries
  • Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP WorldGlobal Shipping Fedex/UPS/DHL/Aramex/ BlueDart/Delhivery/DP World
  • 24/7 Customer Support Email/Chat/Telephonic Support24/7 Customer Support Email/Chat/Telephonic Support
$1,171.53
$1,136.38
Tax included