$1,415.95
$1,373.48
-3%
World's First Climate Tech Platform | Free Delivery in India | Global Shipping

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase
| Country of Origin | India |
|---|---|
| Brand | Parker UCC |
| Model | FM.26 122 329 |
| Series | Flowline |
| Maximum Operating Temperature | 90°C |
| Minimum Flow Rate | 1L/min |
| Maximum Flow Rate | 9L/min |
| Wetted Materials | Acetal, Stainless Steel, Polytetrafluoroethylene Filled Nylon, Steel, Nitrile, Borosilicate Glass, Viton, Brass |
| Connection Thread Standard | BSP Parallel, BSP, BSPT, ISO 228 |
| BS2056 EN 58J, BS 970 316S 16, BS 2874 CZ114, BS970/1 | 1991, BS 970 316S |
The Parker UCC FM.26 122 329 Flowline Series Flow Meter is an industrial-grade flow indicator designed for precise measurement of liquid flows ranging from 1 liter per minute to 9 liters per minute. Constructed with robust materials such as Acetal, Stainless Steel, and PTFE filled Nylon, this flow meter offers excellent chemical resistance and mechanical durability.
This model supports multiple BSP thread sizes including 1-1/4 inch, 3/4 inch, 3/8 inch, 1/4 inch, and 1 inch, with BSP Parallel and BSPT thread standards as per ISO 228, making it highly versatile for various pipe connection requirements in industrial settings.
Operating reliably up to a maximum temperature of 90°C and pressure resistance up to 350 bar, it ensures dependable performance even in demanding high-pressure applications. Accuracy is maintained within ±5% Full Scale Deflection (FSD) with repeatability at ±1% FSD, making it suitable for critical process control environments.
The flow meter features a magnetically coupled internal piston that moves against a calibrated spring according to differential pressure changes, which allows direct reading of flow rate on an outer graduated sleeve. The device is relatively insensitive to viscosity changes and can be installed in any orientation, providing flexibility in system designs.
Mature engineering and compliance with various British standards such as BS2056 EN 58J and BS 970 316S 16 impart confidence in quality and longevity. The device is calibrated for use with oil or water applications, broadening its utility across hydraulic, pneumatics, and fluid handling industries.
Capable of operating at maximum temperatures up to 90°C. Constructed with wetted materials including Acetal, Stainless Steel, and PTFE filled Nylon for durability. Designed for pressures up to 350 bar ensuring high-pressure tolerance.
Provides accuracy of ±5% Full Scale Deflection (FSD) and repeatability of ±1% FSD. Utilizes differential pressure detection across a piston for precise flow measurement. Suitable for installation on any plane with direct reading facility calibrated for oil or water.
Complies with standards BS2056 EN 58J, BS 970 316S 16, and others ensuring quality assurance.
This Flow Meter is ideal for industrial automation, hydraulic systems, manufacturing process control, and water treatment applications requiring reliable and accurate flow measurement. Explore more Parker UCC instrumentation and flow monitoring solutions on EnvMart.
Review sent
Your review cannot be sent
Global Payments 140+ Countries
Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP World
24/7 Customer Support Email/Chat/Telephonic Support
Comments (0)
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent