$1,415.95
$1,373.48
-3%
World's First Climate Tech Platform | Free Delivery in India | Global Shipping

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase
| Country of Origin | India |
|---|---|
| Brand | Parker UCC |
| Body Material | Brass |
| Model | FM26322122 |
| Series | Flowline |
| Maximum Operating Temperature | 90°C |
| Minimum Flow Rate | 5L/min |
| Maximum Flow Rate | 55L/min |
| Wetted Materials | Brass |
Parker UCC FM26322122 Flow Meter is a high-precision variable area flowmeter from the Flowline series designed for industrial liquid flow measurement ranging from 5L/min to 55L/min. The flowmeter features a robust brass body, granting durability and resistance to operational wear. It is optimized for installation on 3/4 inch pipe diameters with a 3/4 BSP connection, facilitating integration in existing fluid systems.
Utilizing differential pressure across an internal piston, this flowmeter converts fluid flow rate into a direct reading via its graduated flow scale located on the transparent outer viewing sleeve. The indicator ring is magnetically coupled to the piston, providing precise flow indication without mechanical linkage.
This flowmeter is engineered to operate reliably under high pressure conditions up to 350 bar and withstand temperatures up to 90°C, making it suitable for demanding industrial environments including manufacturing, hydraulic systems, and process automation.
The instrument offers an accuracy of ±5% full scale deflection with repeatability of ±1%, ensuring reliable flow measurement. Its design makes it relatively insensitive to viscosity changes, and it is directly calibrated for oil or water media, expanding its application versatility.
Ideal for use in industrial, laboratory, HVAC, and commercial fluid flow monitoring systems, the Parker UCC Flowline Series Flow Meter provides dependable, precise measurement essential for process control and quality assurance.
Brass body construction ensures robust performance and longevity. Operates reliably up to a maximum temperature of 90°C. Designed for pipe diameters of 3/4 inch with 3/4 BSP connection. Capable of handling pressures up to 350 bar suitable for high-pressure applications.
Accuracy of ±5% full scale deflection and repeatability of ±1%. Features a graduated flow scale on the viewing sleeve for direct readings. Indicator ring magnetically coupled to the internal piston provides precise flow indication.
Insensitive to viscosity changes, calibrated for oil or water flow measurement. Explore the comprehensive range of flow sensors and meters on EnvMart to enhance your industrial instrumentation solutions.
Review sent
Your review cannot be sent
Global Payments 140+ Countries
Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP World
24/7 Customer Support Email/Chat/Telephonic Support
Comments (0)
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent