Previous
Next
Share
Free Delivery in India | Lowest Global Shipping Charges
24/7 Customer Support
24/7 Customer Support

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

24/7 Customer Support
Save up to 28% with GST Input

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

Lowest Price Challenge
# Lowest Price Challenge

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Lowest Price Challenge
100% Original Products

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase

Wireless Vibration Sensor WBS1

SKU AACBF Category Vibration Sensors Brand ROKADE Condition New

Specifications

Accuracy + / - 5% @ 150 Hz| 1 g
Frequency range Vel & Disp (10 ~ 1|000 Hz)| Acc (2 ~ 5000Hz)
Capacity 750 mAh
Type Li-ion
Operating Temperature -30 ~ 70
Dimensions 41.8 x 69.4 mm
Mounting M6 threaded hole
Wireless Range Upto 50 meters depending on the environment
Protection Type IP67
Humidity 0% to 95% relative humidity (RH)
Weight 228 g
Charging Time 1 - 2 hours
Sensing element Piezoelectric / Annual shear mode
Signal RMS| Peak| peak to peak| Bearing status value
LED indicator Red| Green| Blue
Frequency response 3dB 0.4 Hz - 10 KHz
ISO standard compliance ISO 10816-3
Full scale 50 g
Signal-to-Noise ratio Greater Than 80 dB
Explosion proof Exib IIC T4 Ga
FFT resolution 6400 lines
Waveform type WAcceleration| Velocity| Displacement| Envelopeaveform type
Bearings condition BCLess Than 1| well| 1
Measurement duration 3s typical (affected by distance & communication)
Vibration setup Automatic definition of the measurements based on the machine class
Operating lifetime more than 10 hours (Continuously)
Rechargable with marching charger
Wireless protocol Wifi point to point
Standard mobile system compatibility Android
Sampling frequency Max 25.6 Khz

Key Features

  • Multiple parameter collection- Support for multiple signal types: ACC, Vel, Disp, Env, BC, FFT, Time waveform
  • Wireless Signal acquistion Wireless communication range up to 50 meters (depending on field condition)
  • Ultra low power consumption 10 hours of operation on a single charge

Product Description

Wireless Vibration Sensor (WBS1) is a handheld single-axis piezoelectric wireless accelerometer that runs on Android Mobile / Tab. The ROKADE WBS1 is a wireless ultra-low noise accelerometer with a bandwidth of 10 kHz, which outperforms most conventional accelerometers in particular.

  • Quick installation Built-in magnetic suction base
  • Premium protection IP67 industrial grade protection with Ex Proof certification
  • Easy to charging Standard USB connector helping you charging at any time
Wireless Vibration Sensor WBS1
Looking to purchase in bulk?
  • Purchase item in bulk quantity
  • Get best price for your business

Comments (0)

No customer reviews for the moment.

Frequently Asked Questions

The frequency range for velocity and displacement is from 10 to 1,000 Hz, while for acceleration it ranges from 2 to 5,000 Hz.

It has a battery capacity of 750 mAh and uses a Li-ion type battery.

The dimensions are 41.8 x 69.4 mm, and it weighs 228 g.

The operating temperature range is from -30 to 70 degrees Celsius.

It supports multiple signal types including RMS, Peak, peak to peak, and bearing status value.

The accuracy is ± 5% at 150 Hz and 1 g.

The maximum sampling frequency is 25.6 kHz.

It has an IP67 protection rating and is explosion proof with Exib IIC T4 Ga certification.

The Wireless Vibration Sensor WBS1 is compatible with standard Android mobile systems.

The typical measurement duration is 3 seconds, though it can be affected by distance and communication.

Related Products

$225.75
Tax included
Quantity
Delivery Time Delivered within 0-3 days
  • Global Payments 140+ CountriesGlobal Payments 140+ Countries
  • Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP WorldGlobal Shipping Fedex/UPS/DHL/Aramex/ BlueDart/Delhivery/DP World
  • 24/7 Customer Support Email/Chat/Telephonic Support24/7 Customer Support Email/Chat/Telephonic Support
$225.75
Tax included