Previous
Next
Share
Free Delivery in India | Lowest Global Shipping Charges
24/7 Customer Support
24/7 Customer Support

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

24/7 Customer Support
Save up to 28% with GST Input

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

Lowest Price Challenge
# Lowest Price Challenge

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Lowest Price Challenge
100% Original Products

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase

Parker Flowline Series Industrial Flow Meter 5L/min to 46L/min, BSP Parallel Thread 1/2 in, 1-1/4 in, 1/4 in, 3/4 FM26222222

Category Flow Meter Brand Parker Condition New

Specifications

Country of Origin India
Brand Parker
Model FM26222222
Series Flowline
Maximum Operating Temperature 90°C
Minimum Flow Rate 5L/min
Maximum Flow Rate 46L/min
Wetted Materials Stainless Steel, Brass (Brass Version), Fluoroelastomer
Connection Thread Standard BSP Parallel
BS 2874 CZ114, BS 2056 EN 58J, BS 970 316S, BS970/1 1991:316S31

Key Features

  • High-pressure flow indicator suitable for industrial applications.
  • Operates up to 90°C maximum temperature.
  • Constructed with stainless steel, brass, and fluoroelastomer wetted parts.
  • Features direct reading with a magnetically coupled indicator ring.
  • Calibrated accuracy of plus or minus 5% Full Scale Deflection and repeatability of plus or minus 1% FSD.
  • Designed for oil and water media with variable flow ranges.
  • Capable of handling pressures up to 350 bar.

Product Description

The Parker FM26222222 Flowline Series flow meter is an industrial-grade, high-pressure variable flow indicator designed to provide accurate flow rate measurements ranging from 5 liters per minute to 46 liters per minute. Featuring BSP parallel threaded connections available in sizes 1/2 inch, 1-1/4 inch, 1/4 inch, and 3/4 inch, this flow meter is adaptable to diverse piping configurations. It employs a differential pressure technique where the internal piston moves against a calibrated spring as flow increases, with a magnetically coupled indicator ring providing direct visual readings.

This device operates reliably at temperatures up to 90 degrees Celsius and pressures up to 350 bar, making it suitable for demanding industrial environments including hydraulic systems and process monitoring. The wetted materials include robust stainless steel, brass versions, and fluoroelastomer seals, ensuring durability and chemical compatibility with oil or water media.

Accuracy is maintained at plus or minus 5% Full Scale Deflection with repeatability within plus or minus 1% FSD, making the meter dependable for precise flow measurement tasks. The flow meter is relatively insensitive to viscosity changes, simplifying calibration and usage in various fluids.

Manufactured in compliance with BS 2874 CZ114, BS 2056 EN 58J, BS 970 316S, and BS970/1:1991:316S31 standards, the Parker Flowline meter meets stringent quality and performance criteria.

This product is ideal for industrial, manufacturing, laboratory, and water treatment applications requiring reliable and accurate flow measurement. Installation is flexible as the device can be mounted on any plane without loss of performance.

High-pressure flow indicator suitable for industrial applications. Operates up to 90°C maximum temperature. Constructed with stainless steel, brass, and fluoroelastomer wetted parts. Features direct reading with a magnetically coupled indicator ring.

Calibrated accuracy of plus or minus 5% Full Scale Deflection and repeatability of plus or minus 1% FSD. Designed for oil and water media with variable flow ranges. Capable of handling pressures up to 350 bar. Complies with BS 2874 CZ114, BS 2056 EN 58J, BS 970 316S, and BS970/1:1991:316S31 standards.

Explore more Parker Flow Meters and related measuring instruments to suit your industrial automation and fluid control system needs on EnvMart.

Parker Flowline Series Industrial Flow Meter 5L/min to 46L/min, BSP Parallel Thread 1/2 in, 1-1/4 in, 1/4 in, 3/4 FM26222222
Looking to purchase in bulk?
  • Purchase item in bulk quantity
  • Get best price for your business

Comments (0)

No customer reviews for the moment.

Frequently Asked Questions

This flow meter has a flow rate range from 5 liters per minute to 46 liters per minute.

It operates at a maximum temperature of 90°C and can handle pressures up to 350 bar.

The wetted materials include stainless steel, brass (for the brass version), and fluoroelastomer.

It features BSP parallel threaded connections.

The calibrated accuracy is plus or minus 5% Full Scale Deflection, with repeatability of plus or minus 1% FSD.

Yes, it is designed for use with oil and water media.

The flow meter can be mounted on any plane without loss of performance, but specific dimensions are not provided.

It complies with BS 2874 CZ114, BS 2056 EN 58J, BS 970 316S, and BS970/1:1991:316S31 standards.

It features a magnetically coupled indicator ring for direct visual readings.

It is constructed with robust materials including stainless steel and brass, ensuring compatibility with various fluids.

It is suitable for industrial, manufacturing, laboratory, and water treatment applications requiring accurate flow measurement.

The device is relatively insensitive to viscosity changes, simplifying calibration and usage in various fluids.

Related Products

Other Products from this brand

$1,421.86
$1,379.20 Save 3%
Tax included
Quantity
Delivery Time Delivered within 0-3 days
  • Global Payments 140+ CountriesGlobal Payments 140+ Countries
  • Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP WorldGlobal Shipping Fedex/UPS/DHL/Aramex/ BlueDart/Delhivery/DP World
  • 24/7 Customer Support Email/Chat/Telephonic Support24/7 Customer Support Email/Chat/Telephonic Support
$1,421.86
$1,379.20
Tax included