$1,415.95
$1,373.48
-3%
World's First Climate Tech Platform | Free Delivery in India | Global Shipping

Shop with confidence knowing that our 24/7 Customer Support is always available to assist with any inquiries

Avail maximum benefits from input tax mechanism on all your Business Invoices. Get GST Invoices on your business purchases. And 0% Taxes on all worldwide deliveries

If you find this product anywhere at lower cost than us. Call us and we will not only match the price but also give a complimentary coupon

Shop with assurance, as each product we offer is 100% original, ensuring quality and authenticity with every purchase
| Country of Origin | India |
|---|---|
| Brand | Parker |
| Model | FM.26 122 129 |
| Series | Flowline |
| Maximum Operating Temperature | 90°C |
| Minimum Flow Rate | 0.2L/min |
| Maximum Flow Rate | 2L/min |
| Wetted Materials | Brass (Brass Version), Stainless Steel, BS 970 316S 16 Stainless Steel (Flow Cone), 316 Stainless Steel, Fluoroelastomer |
| Connection Thread Standard | BSP |
| BS 2874 CZ114 (Brass), BS970/1 | 1991:316S31, BS 970 316S (Stainless Steel), BS 2056 EN 58J |
Parker FM.26 122 129 Flow Meter from the Flowline Series offers reliable flow measurement for industrial applications, supporting flow rates between 0.2L/min and 2L/min. Designed with brass and stainless steel wetted materials, it ensures durability and corrosion resistance. The flow meter operates efficiently up to 90°C and withstands pressures up to 350 bar.
This instrument uses a differential pressure technique with an internal piston moved against a calibrated spring, providing direct, precise readings. The outer viewing sleeve features a graduated scale and a magnetically coupled indicator ring for clear flow indication. Installation can be done on any plane, adding to its versatility in various setups.
With accuracy of ±5% Full Scale Deflection and repeatability within ±1%, the meter maintains dependable performance even with changes in fluid viscosity. The device is calibrated for oil and water, making it suitable for diverse industrial processes. The flow meter adheres to notable British standards, including BS 2874 CZ114 for brass parts and BS970/1:1991 for stainless steel components.
This flow meter is ideal for applications in industrial, manufacturing, hydraulic, and process control environments where precise flow rate monitoring is essential. Its robust construction and wide connection thread size options provide compatibility with various piping and system designs.
High-pressure Flow Meter with maximum operating temperature of 90°C. Constructed with brass and stainless steel wetted materials for durability. Features differential pressure piston technology for accurate readings. Includes magnetically coupled indicator ring for easy flow visualization.
Suitable for industrial oil and water flow measurement applications. Pressure rating up to 350 bar for robust performance. Accuracy of ±5% Full Scale Deflection and repeatability ±1%. Compliant with multiple BS standards including BS 2874, BS 970, and BS 2056.
Installation flexibility allows mounting on any plane. Explore EnvMart’s range of industrial flow measuring instruments to find the solution that fits your operational needs.
Review sent
Your review cannot be sent
Global Payments 140+ Countries
Global Shipping Fedex/UPS/DHL/Aramex/
BlueDart/Delhivery/DP World
24/7 Customer Support Email/Chat/Telephonic Support
Comments (0)
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent